In Pics: NASA set to return to the Moon with the Artemis 1 Mission | Photos

In Pics: NASA set to return to the Moon with the Artemis 1 Mission

NASA is all set to return to the Moon with the upcoming Artemis 1 Mission which is scheduled for launch from the Kennedy Space Center on August 29 this year, commemorating the 50th anniversary of Apollo 17, the last time NASA sent a manned mission to the Moon, making it even more significant.

By: SHAURYA TOMER
| Updated on: Aug 18 2022, 19:57 IST
Nasa
According to NASA, Artemis I will be the first uncrewed flight test of the Space Launch System rocket and the Orion spacecraft. The Orion capsule will carry various objects like Snoopy dog toy which will fly as a zero-gravity indicator in the capsule. A new version of Alexa called Callisto created by Lockheed Martin, Amazon, and Cisco will also be aboard the spacecraft. (REUTERS)
1/5 According to NASA, Artemis I will be the first uncrewed flight test of the Space Launch System rocket and the Orion spacecraft. The Orion capsule will carry various objects like Snoopy dog toy which will fly as a zero-gravity indicator in the capsule. A new version of Alexa called Callisto created by Lockheed Martin, Amazon, and Cisco will also be aboard the spacecraft. (REUTERS)
Artemis
The Artemis Programme is NASA’s first attempt to send a manned mission to the Moon since the Apollo missions in 1972. Earlier this month, NASA administrator Bill Nelson said, “To all of us that gaze up at the Moon, dreaming of the day humankind returns to the lunar surface, folks, we're here. We are going back.” (REUTERS)
image caption
2/5 The Artemis Programme is NASA’s first attempt to send a manned mission to the Moon since the Apollo missions in 1972. Earlier this month, NASA administrator Bill Nelson said, “To all of us that gaze up at the Moon, dreaming of the day humankind returns to the lunar surface, folks, we're here. We are going back.” (REUTERS)
Artemis 1
The rocket and the Orion spacecraft have already been rolled out onto the launchpad on August 16. Although the rollout was scheduled to happen today on August 18, NASA moved up the plans and rolled out the Orion spacecraft on top of NASA’s brand-new Space Launcher System. (REUTERS)
image caption
3/5 The rocket and the Orion spacecraft have already been rolled out onto the launchpad on August 16. Although the rollout was scheduled to happen today on August 18, NASA moved up the plans and rolled out the Orion spacecraft on top of NASA’s brand-new Space Launcher System. (REUTERS)
NASA manikin
When NASA launches the Artemis 1 mission using the Space Launcher System on August 29, the Orion spacecraft, although unmanned, will carry 3 manikins called Zohar, Helga and Campos to space as human stand-ins for various tests and studies. They will be retrofitted with a vast number of sensors to conduct tests regarding the spaceflight. (NASA)
4/5 When NASA launches the Artemis 1 mission using the Space Launcher System on August 29, the Orion spacecraft, although unmanned, will carry 3 manikins called Zohar, Helga and Campos to space as human stand-ins for various tests and studies. They will be retrofitted with a vast number of sensors to conduct tests regarding the spaceflight. (NASA)
NASA
ason Hutt, NASA lead for Orion Crew Systems Integration said, “It’s critical for us to get data from the Artemis I manikin to ensure all of the newly designed systems, coupled with an energy dampening system that the seats are mounted on, integrate together and provide the protection crew members will need in preparation for our first crewed mission on Artemis II.” (NASA)
5/5 ason Hutt, NASA lead for Orion Crew Systems Integration said, “It’s critical for us to get data from the Artemis I manikin to ensure all of the newly designed systems, coupled with an energy dampening system that the seats are mounted on, integrate together and provide the protection crew members will need in preparation for our first crewed mission on Artemis II.” (NASA)
First Published Date: 18 Aug, 19:57 IST
NEXT ARTICLE BEGINS